Double Speed Chain Automatic Production Line for Factory Automatic Assembly Line Conveyor

Product Description

⚙️ Product Description
Product Description
Machine sizeSupport customization
Machine line body structureMachine stand support made of 40*40*2.0mm strong aluminum profile, Height =740mm, edge frame with 118*100*2.0mm high quality aluminum. Storage Second floor table (if needed) hooked by 50*50*2.0mm square coated steel.
Tooling board sizes(L) 600*(W)800*(T)20MM, Coated with stastic free PVC rubber, 15M Long totally with 20 pcs of plates. With steel support at the bottom of the plate, can carry on up to 100kgs cargo for each plate. 360° rotation round plates can be optional by your extra requirements.
Independent workstation8 PCS of independent work station is arrange at each side, totally 16 pcs for two sides.
Storage tableEach workbench can be equipped with a storage platform, with adjustable height and angle. Size supports customization.
Instruction screenEach storage platform can be equipped with an indicator screen.
Lift blockerEach workstation is equipped with a lifting stopper, which is controlled by the release button of each workstation and used for production process control.
Mechanical armThe robotic arm can help unload and improve assembly efficiency.
Control SystemWhole Line controlled by Mitsubishi PLC System with touch screen operation. Pneumatic Control with Airtac valve with independent control switches for each plate with OMRON Relay.
Driving SystemDriven by 2HP Gear motor (2 sets) with speed up to 18m/min adjustable.
📋 Product Detail
Product Detail
Product Detail
📸 Actual Product Photos
Product
Product
Product
Product
Product
Product
🏆 Successful Project
Successful Project
🛠️ After-sales Service
Service
❓ FAQ
Q1: Whether you can offer customized service?
A1: Yes, the working condition of every customer is different. All of our products can be customized depending on customers' requirements. Please give us the information as straightforward as you can, so we can provide our best design to suit your demands.
Q2: How to confirm the working class of the equipment?
A2: Please offer us the working environment, working duration, and frequency, and our engineers shall calculate it for you.
Q3: What kind of package do you provide?
A3: Components and electrical parts are packed in wooden fumigation boxes. The main frames are covered by protective woven plastic cloth to ensure safe transit.
Q4: What kind of assistance can you offer with equipment installation?
A4: We have a professional installation team who has gone to many countries to assist with the installation. If you need us to send a technician to your factory, please let us know.
Q5: What payment terms can you accept?
A5: We support L/C, D/A, D/P, T/T, Western Union, and MoneyGram payments. For trade terms, we handle FOB, CIF, DDU, EX WORKS, etc.
Q6: What is the estimated lead time?
A6: Lead time depends on the scale of the project and customization requirements. Generally, production takes 30-45 days. We will provide a specific timeline upon confirmation of your requirements.

Related Products